Improving access infrastructure to the port in Stepnica and Police

A project by the Szczecin Maritime Office. Dredging of the approach channel to the port in Stepnica and dredging work on the Police Canal and the Kiełpin Canal.

Implementation details

Investor: Szczecin Maritime Office

Industry: Hydrotechnical

Scope of the project: Dredging work and construction of bank reinforcement

Time to get your act together

Contact us and let's create something special together.

Stepnica

Dredging the approach channel to the port in Stepnica from Pier 24 to the breakwater heads of the Railway Basin via the ST1-ST2 buoy pair (to a depth of 4.5 m) as well as widening this channel (to approx. 40 m), dredging the turning basin (to a depth of 4.5 m), and increasing its diameter (to approx. 160 m).

Police

Dredging work involving the deepening and widening of the navigation channel on the Policki Canal (to a depth of 10.5 m and a width of 100 m). Dredging and widening of the Kiełpiński Canal (to a depth of 3 m and a width of 25 m), including the approach (to a depth of 3.2 m and a maximum width of 35 m) and the bend (to a depth of 3.0 m and a width of 35 m). Stabilization of the slope of Kiełpiński Ostrów Island.