Improving access infrastructure to the port in Stepnica and Police
- Homepage
- Realizations
- Improving access infrastructure to the port in Stepnica and Police
Implementation details
Investor: Szczecin Maritime Office
Industry: Hydrotechnical
Scope of the project: Dredging work and construction of bank reinforcement
Stepnica
Dredging the approach channel to the port in Stepnica from Pier 24 to the breakwater heads of the Railway Basin via the ST1-ST2 buoy pair (to a depth of 4.5 m) as well as widening this channel (to approx. 40 m), dredging the turning basin (to a depth of 4.5 m), and increasing its diameter (to approx. 160 m).
Police
Dredging work involving the deepening and widening of the navigation channel on the Policki Canal (to a depth of 10.5 m and a width of 100 m). Dredging and widening of the Kiełpiński Canal (to a depth of 3 m and a width of 25 m), including the approach (to a depth of 3.2 m and a maximum width of 35 m) and the bend (to a depth of 3.0 m and a width of 35 m). Stabilization of the slope of Kiełpiński Ostrów Island.